Governance and verification
Steps
- Council asset owner: verify Rotura boundary, critical assets and regional hazard maps before design.
- Infrastructure lead: add resilience scoring to the local government asset plan and long-term plan bids.
- Emergency-management controller: test rainfall, heat and outage triggers with partners annually.
Partners
Rotura public works/infrastructure lead responsible for the local government asset plan, Regional council hazard-mapping and flood/stormwater staff for Rotura catchments, Civil Defence Emergency Management and public health emergency-management partners, Water and transport operators serving Rotura, New Zealand
Priority sites
Repetitive-loss Rotura road segments, culverts and low points tied to intense rainfall flooding, Rotura schools, clinics and community halls vulnerable to heat stress and needed as welfare sites, Rotura water/wastewater pump controls, depots and communications nodes exposed to storm outages
Metrics
number of Rotura critical sites risk-screened, kilometres of drainage/road access upgraded, public facilities meeting cooling-ready standard, critical utility nodes with tested backup power