Governance and verification
Steps
- Municipal adaptation plan owner: appoint a resilience lead to maintain one Germany (DE) project register for heat, drainage, and floodproofing.
- Länder water/health agencies: validate hazards using DWD, river basin authority, and health data before design procurement.
- Municipality and asset owners: lock maintenance budgets, MRV metrics, and EU climate-adaptation finance responsibilities before construction.
Partners
German Environment Agency/Umweltbundesamt and Deutscher Wetterdienst for climate, heat, and adaptation evidence., Länder water agencies and river basin authority bodies for Rhine, Elbe, Danube, Weser, Oder and tributary flood data., Germany municipal public works, transport operators, and Deutsche Bahn/local road authorities for critical rail/road drainage., Local health offices, care-home operators, schools, clinics, and community facility managers for heat-health planning.
Priority sites
Starkregen-prone underpasses, station approaches, school access roads, and critical rail/road drainage bottlenecks in German municipalities., Older housing districts, care homes, clinics, schools, libraries, and Rathaus buildings needing heat-health planning and passive cooling., Floodplain wastewater plants, substations, depots, bridges, and access roads identified by Germany river basin authority maps.
Equity approach
Target heat-health planning, cooling refuges, and drainage works where social vulnerability overlaps German hazard maps.
Metrics
m2 depaved or converted to retention, m3 stormwater storage added, number of cool public buildings activated, critical rail/road drainage closures avoided, floodproofed lifeline assets, heat outreach contacts